SSCI: Hazardous Materials Manager for SH 288 Toll Lanes Expansion Project - SSCI Environmental

SSCI began work on the State Highway (SH) 288 Toll Lanes Expansion Project in Harris County providing hazardous materials management and emergency response in July 2016. Since that time, SSCI has assisted in construction activities, hazardous material handling and disposal, and in managing environmental hazards associated with the project. Construction activities have taken place in the early morning hours before rush hour traffic and in the middle of the night.  We’ve been there to see it all.

The project consists of expanding three major interchanges within a 10.3-mile stretch from US Interstate 59 (US 59) to the Harris County line at Clear Creek. The completed project will provide direct accessibility to the Texas Medical Center and relieve traffic congestion on SH 288.  The construction of new toll lanes will connect Sam Houston Parkway (Beltway 8) and Interstate Highway (IH) 610, and includes the construction of new tolled lanes, direct connectors, an Electronic Toll Collection System, utility adjustments, and adjustments of existing lanes.  Construction began in October 206.

 

Visit Drive288 for information regarding the construction activities and lane closures.

 

 

Environmental concerns for the project were identified in the Environmental Assessment prepared for SH 288, US 59 to CR 60, Harris and Brazoria Counties, prepared by the US Department of Transportation Federal Highway Administration (FHWA) and the Texas Department of Transportation (TxDOT) in April 2013.   The project area is located with an highly urbanized community south of Houston.  The Environmental Assessment was a comprehensive review of the construction project and any impacts on the environment including but not limited to socioeconomic impacts, environmental justice, wildlife, vegetation, soils, threatened and endangered species, fish habitat, water quality, noise, air quality, floodplains, coastal zones, cultural resources, and hazardous materials.  Several hundred potentially impacted properties were identified in the immediate vicinity of the expansion project. Further investigation included soil and groundwater sampling to depths greater than 60 feet below ground surface in specific construction areas.  Ultimately, the FHWA determined that a significant impact to the human or natural environment would not be created by the proposed project.  

SSCI’s role in the project has been to provide construction oversight regarding potential hazardous materials identified during the performance of the Environmental Assessment. These hazards have included asbestos and chemical compounds in soil and groundwater.  Our team of professionals have developed a Soil Groundwater Management Plan working closely with the Drive 288 team and TxDOT.